General planning · HOAI LP 1–9 · one line of responsibility

One project. One fee. One hand.

A renovation needs a design, a structure, an energy concept, a permit and construction management. The usual arrangement is five contracts and five responsible parties, between whom you coordinate yourself. We think it the other way round: seven disciplines, one point of contact, one continuous responsibility — from the first sketch to handover of the keys. Keystone does not sell services. Keystone sells control over complexity.

General planning

One fee · HOAI LP 1–9

Seven disciplines, one contract, one point of contact. Transparent, to the three-pillar calculation.

System · seven disciplines, one line CONCEPT HANDOVER Architectural service Structure Building physics Energy consultancy CO₂ balance Permit · AKNW Construction management

Disziplinen unter einem Dach

Konzept · Tragwerk · Bauphysik · Energieberatung · CO₂-Bilanz · Bauleitung

Partnerbüros

AKNW-Architekt · Tragwerks-, Energie- und DGNB-Partner im Netzwerk

LP 4 · Bauantrag

Genehmigungsplanung in Kooperation mit AKNW-Partner-Architekt

Erfahrung

10 Jahre Profession · 70+ Bauvorhaben · Konzept bis Bauleitung

Ablauf · 5 Schritte

From the sketch to handover — on a single line.

  1. Concept & needs

    We clarify what you really want — use, budget, expectations, time horizon. HOAI LP 1. Before a line is drawn, the goal is set.

  2. Design & variant study

    The architectural service: floor plans, massing, materiality, two to three considered variants. HOAI LP 2–3. This is where the character of the building takes shape.

  3. Structure, building physics, energy — integrated

    Structure, thermal protection, sound and the energy concept arise within the design, not as a later requirement. No expensive corrections, no thermal bridges added afterwards.

  4. Permit

    The building-application set and submission. HOAI LP 4 in cooperation with our AKNW partner architect — in substance on the basis of our design work. It remains a single point of contact nonetheless.

  5. Execution & construction management

    Execution planning, tendering, construction management through to handover. HOAI LP 5–9. The same hand that planned carries the responsibility on the building site.

Anfrage · 5 Schritte

Anfrage in 30 Sekunden.

Fünf Fragen. Eine pro Schritt. Antwort persönlich von Robin Henn binnen 24 Stunden.

Schritt 1 von 5

Was möchten Sie planen?

Wo soll es entstehen?

Stadtteil oder Postleitzahl genügt — wir prüfen die Bauamts-Zuständigkeit.

Wann soll es losgehen?

Worum geht es konkret?

Kurze Beschreibung — wenige Sätze reichen. Bilder schicken Sie am einfachsten per WhatsApp.

Lieber direkt schreiben? WhatsApp +49 175 44 39 215 — Fotos, Sprachnachricht, Plan, alles möglich.

Wie erreichen wir Sie?

Robin Henn meldet sich persönlich binnen 24 Stunden.

E-Mail oder Telefon — eines reicht.

HOAI-Hinweis: Diese Anfrage ist keine Honorar-Vereinbarung. Sie erhalten zuerst eine fachliche Einschätzung.

Anfrage angekommen.

Robin Henn meldet sich persönlich binnen 24 Stunden — meist deutlich schneller.
Auf Wunsch dürfen Sie Fotos der betroffenen Wand jederzeit per WhatsApp nachschicken.

FAQ

One hand. Seven disciplines. No interfaces at which responsibility disappears.

The questions every client asks before a larger project — answered plainly, before you commission us, in writing.

Your project deserves a line of responsibility.

Describe your project to us — new build, renovation or conversion. We respond within 24 hours with substance, not with a pitch. A first consultation, without obligation, in confidence, at no fee.

WhatsApp Call